How much does it cost to build an architect-designed house?

Build cost per square metre, design fees, consultants and contingency: an honest breakdown of where the money goes.

The first question almost every client asks is the hardest to answer in one number. Here is how we build up a realistic budget for a new house.

Construction cost

Construction is roughly 75–80% of the total. It depends on size, site, specification and the local building market, so we always start with a range and narrow it at every stage.

Fees and surveys

  • Architectural fees: typically 8–12% of construction.
  • Structural and services engineers: 2–4%.
  • Surveys, planning and approval fees: 1–2%.

Always keep a contingency

We recommend 8–10% for a new build and up to 15% for work to an existing building, where surprises hide behind every wall.